Repair and maintenance work
In order to perform the conservation work on the hull underbody and the annual repair and maintenance work, the passenger motorboat “LANGEOOG III” from the Langeoog group of islands is at the yard. It will be docked here from 24 October to 18 November. What’s more, the control work on the propeller and shafts, the high-performance rudder and the bow thruster is being completed. An examination by DNV GL and the analysis of the nautical devices and systems, as well as an inspection of the air conditioning, are also to be completed at our yard.
LANGEOOG III:
Lpp = 42,40 m
Beam = 10,00 m
Draught = 1,33 m